Forum logo Welcome, Guest. Please login or register.
Did you miss your activation email?
November 26, 2024, 11:48:06 PM
Home | Help | Login | Register Planet Bluegrass | Facebook | Twitter | Shop
News: This is the "archived" version of the old Festivarian Forum.  To create new posts, visit Festivarian.com

NavTree open  Festivarian Forum
NavTree sideNavTree open  General Category
NavTree downNavTree sideNavTree open  Telluride Bluegrass Festival (Moderators: TellurideTom, BluegrassNat)
NavTree downNavTree downNavTree sideNavTree open  Town Park Stage slated to be rebuilt by summer of 2016
« previous next »
Pages: [1] Go Down Print
topic icon Author Topic: Town Park Stage slated to be rebuilt by summer of 2016  (Read 11755 times)
FaceOnMars
!!!!BACON!!!!
*****

Festivation rating 420
Offline Offline

Posts: 1183



URL icon « on: May 03, 2015, 11:02:31 AM »

My suggestion would be to auction off wood from the existing stage to help raise funds for some sort of memorial re: those who once stood on the stage (and the one prior), yet are no longer with us in the physical sense.

Here's the story in today's paper:

http://www.telluridenews.com/articles/2015/05/03/news/doc5543fcced746f603287023.txt

Town Park stage getting rebuilt by next summer

Meeting Tuesday to gather public input
By Stephen Elliott
Staff Reporter
Published: Sunday, May 3, 2015 6:05 AM CDT

With 25 years of musical history weighing down the Town Park stage, the Town of Telluride thinks it’s time for a new one. 

The town has budgeted $1.8 million for the design and construction of a new Town Park Stage, and has hired Shaw Construction and Charles Cunniffe Architects for the project. The plan is to finalize the design and construction schedule in August, begin construction in late September and complete the new stage in time for summer 2016 festivals and events.

On Tuesday at 6 p.m. at Rebekah Hall, the town is holding an open meeting to solicit public input on the design of a new stage. The architects have already consulted with major users of Town Park, including some festival organizers, but now the town wants to hear what the public wants.

“We’re working with users like the Jazz Festival and Bluegrass, but we also want the general public to have input,” Parks and Recreation Projects Coordinator John Wontrobski said. “We have existing users and know what they want, but we don’t know if there are other uses out there that we haven’t thought of.”

* One such new use could be weddings, which decades ago graced the Town Park stage, but haven’t in years. One of the auxiliary structures anticipated in the new designs is a pavilion near the back of the stage that could be used for weddings in the future. Wontrobski said they get requests for weddings in Town Park all the time, but haven’t been able to accommodate those requests with current facilities.

The town started exploring rebuilding the stage in 2008, and even got input from festivals and initial designs before the economy collapsed and plans were put on hold.

“We’re picking up where we left off in 2008,” Wontrobski said. The town and design teams got existing stage users to update questionnaire responses from 2008, which indicate what different event planners require for sound, lighting, square footage and other specifications.

“We just finished compiling survey results from existing stage users and will be analyzing and using that info to determine whether the 2008 plans still work or whether they need tweaking or redesign,” Amy Levek, a past town planning director who’s working as a planner and facilitator for the Shaw/CCA team, said.

The 2008 designs are available on CCA’s website, at  www.cunniffe.com/projects/telluride-town-park.

The $1.8 million budget includes designs for a new stage and auxiliary buildings, but just the construction of the stage. The auxiliary buildings would be built at a later date with yet-to-be-allocated funds.

The additional construction could include the pavilion for weddings, more permanent catering facilities backstage and retaining walls to allow for more bus parking and semi truck maneuverability.

The construction of a new stage would allow for more weight on the stage and storage beneath.

“Once we hear from the public, it’s up to the design team to synthesize all this together and draw up a conceptual plan,” Wontrobski said.

That conceptual plan would then be run through town boards, including the Historic and Architectural Review Commission and the Planning and Zoning Commission before construction begins in September.
IP address Logged



RIP Rob Wasserman
petefrane
Festivarian
****

Festivation rating 420
Offline Offline

Posts: 184


Canadian Walleye


URL icon « Reply #1 on: May 03, 2015, 09:17:52 PM »

Hey FOM
Any more info on the pool being completed by festival time?
IP address Logged
Auntie Hope
LOVES the internet
******

Festivation rating 420
Offline Offline

Posts: 3268



URL icon « Reply #2 on: May 04, 2015, 09:06:26 AM »

Nice. Looks like those stairs might cut into the poser pit though.  LOL LOL LOL

Thanks for posting the article!  Thumbs Up

Auntie Hope  :festivarian2
IP address Logged

InFleckIt! at Hippo Campus
TellurideTom
Moderator
LOVES the internet
*****

Festivation rating 426
Offline Offline

Posts: 2938



WWW
URL icon « Reply #3 on: May 04, 2015, 11:08:40 AM »

Will it still be the "Fred Shellman Memorial Stage" or will it be renamed? EEK!
IP address Logged

Happy Trails....Wave

You can check out my Domain site or follow me on Facebook
psuruns10
Regular Picker
***

Festivation rating 1
Offline Offline

Posts: 139


URL icon « Reply #4 on: May 04, 2015, 12:59:53 PM »

Will it still be the "Fred Shellman Memorial Stage" or will it be renamed? EEK!

I vote to somehow include Sam Bush into the name with no disrespect of Fred Shellman
IP address Logged
FaceOnMars
!!!!BACON!!!!
*****

Festivation rating 420
Offline Offline

Posts: 1183



URL icon « Reply #5 on: May 04, 2015, 04:18:38 PM »

Hey FOM
Any more info on the pool being completed by festival time?

pf: not sure, haven't ventured over there specificallly ... but according to the TOT website, the new restroom/shower facility was completed in march and the second phase (actual pool) it's moving along:

http://www.telluride-co.gov/index.aspx?NID=185
IP address Logged



RIP Rob Wasserman
swander99
Old Timer
******

Festivation rating 420
Offline Offline

Posts: 972



URL icon « Reply #6 on: May 05, 2015, 09:31:48 AM »

Hey FOM
Any more info on the pool being completed by festival time?  OPEN JUNE 15

pf: not sure, haven't ventured over there specificallly ... but according to the TOT website, the new restroom/shower facility was completed in march and the second phase (actual pool) it's moving along:

http://www.telluride-co.gov/index.aspx?NID=185

 Thumbs Up     Sunshine     Thumbs Up
IP address Logged

HEEN!
Jamin
Festivarian
****

Festivation rating 0
Offline Offline

Posts: 157


URL icon « Reply #7 on: May 05, 2015, 04:09:57 PM »

Wow! Will this take away from the camping area in Town Park?
IP address Logged
Auntie Hope
LOVES the internet
******

Festivation rating 420
Offline Offline

Posts: 3268



URL icon « Reply #8 on: May 07, 2015, 09:48:53 PM »

Wow! Will this take away from the camping area in Town Park?

Not only a new pool...

A NEW BATH HOUSE AT WARNER!!!
IP address Logged

InFleckIt! at Hippo Campus
completejohn
Old Timer
******

Festivation rating 420
Offline Offline

Posts: 795


Let the fest begin!


URL icon « Reply #9 on: May 08, 2015, 11:30:33 AM »

Wow! Will this take away from the camping area in Town Park?

Not only a new pool...

A NEW BATH HOUSE AT WARNER!!!

...and they promise to hook the new bath house up to an ice machine for the showers.
IP address Logged

There are only THREE things in life...and I forget what they are!
- John Hiatt
Auntie Hope
LOVES the internet
******

Festivation rating 420
Offline Offline

Posts: 3268



URL icon « Reply #10 on: May 08, 2015, 04:12:56 PM »

Wow! Will this take away from the camping area in Town Park?

Not only a new pool...

A NEW BATH HOUSE AT WARNER!!!

...and they promise to hook the new bath house up to an ice machine for the showers.

Well, won't that be nice.  :ball
IP address Logged

InFleckIt! at Hippo Campus
FaceOnMars
!!!!BACON!!!!
*****

Festivation rating 420
Offline Offline

Posts: 1183



URL icon « Reply #11 on: November 02, 2015, 07:21:17 PM »

Without a net ...

IP address Logged



RIP Rob Wasserman
completejohn
Old Timer
******

Festivation rating 420
Offline Offline

Posts: 795


Let the fest begin!


URL icon « Reply #12 on: November 03, 2015, 11:02:35 AM »

Build it and WE will come...
IP address Logged

There are only THREE things in life...and I forget what they are!
- John Hiatt
Bevin
Old Timer
******

Festivation rating 420
Offline Offline

Posts: 1040



URL icon « Reply #13 on: November 03, 2015, 01:20:35 PM »

Thanks for the pic and the update, FOM.  Looking forward to following the progress on this exciting project.
IP address Logged

Copyright 2009, a production of Camp Totally Lit - All rights reserved

"There's always a Clapper."
Pages: [1] Go upGo Up Print 
« previous next »
Jump to:  

Planet Bluegrass | Facebook | Twitter | Shop | Festivarian Forum rss feed Powered by SMF | SMF © Simple Machines LLC